RFP - Technical Viability assessment of Green Ammonia integration into exi...

World Resources Institute / India Resources Trust

  • India
  • Job
  • Deadline : 23 December 2026 (26 days left)

Network member? Your CV and answers are ready in one click, and the application is added to your tracker.

Requirements at a glance

  • Duration6 months

Collected automatically from the posting: check them in the official posting.

Full job description

Terms of reference

Technical Viability assessment of Green Ammonia integration into existing Indian urea plants

Background

India Resources Trust (IRT), an independent knowledge organisation, provides objective information and practical proposals to foster environmentally sound and socially equitable development. Know more: wri-india.org

2. Objectives of the Consultancy

IRT is seeking a technical consulting firm to assess the feasibility and integration requirements for externally sourced Green Ammonia into existing Indian urea plants.

In conventional ammonia-urea complexes, natural gas is used both as feedstock and as a source of energy. The CO? generated during ammonia production is also used in urea manufacture. Replacing part of the grey ammonia with externally sourced Green Ammonia can therefore affect the plant’s CO2 supply, energy and steam balance, operating requirements and production costs.

The implications will vary by plant, depending on its technology, configuration, operating conditions, utilities, CO2 systems and access to Green Ammonia and transport infrastructure. IRT intends to commission a study that examines these factors at plant level and identifies practical options for integrating Green Ammonia into existing facilities.

The study should provide a clear view of the modifications and infrastructure required, the implications for plant operations and resource requirements and the potential emissions reductions under different integration scenarios.

Responsibilities

The consultant will work with IRT to select representative plants, collect and review available data, undertake plantlevel technical assessments and develop Technical Viability estimates. The work is expected to cover the following activities.

1. Plant selection and baseline assessment

In consultation with IRT, select existing Indian urea plants for detailed assessment. The selection should reflect differences in:

  • Natural gas use and ammonia production configuration
  • CO2 generation, capture and utilization
  • Ammonia storage and handling facilities
  • Plant location, logistics and access to Green Ammonia supply
  • Potential access to external CO2 sources

For each plant, document the existing configuration and operating conditions, including ammonia and urea capacity, process technology, natural gas and utility consumption, energy and steam systems, CO2 systems, storage infrastructure, capacity utilization and key operating constraints.

2. Green Ammonia integration options

Identify and assess technically feasible options for integrating externally produced Green Ammonia into each selected ammonia-urea complex. At a minimum, consider:

  • Supply of external Green Ammonia to the existing ammonia system
  • Partial substitution of grey with green ammonia at different integration levels
  • Other options where these are technically justified by the plant configuration

The consultant should not assume a preferred integration pathway in advance. Each option should be assessed against plant-specific technical requirements, operating implications, infrastructure needs and resource implications.

3. Process and infrastructure assessment

For each plant and integration scenario, assess the implications for

  • Material and CO2 balances
  • Energy, steam, power and other utilities
  • Process integration, equipment, piping, instrumentation and controls
  • Ammonia storage, unloading, transfer and handling
  • Safety systems, operating flexibility, start-up and shutdown
  • Production levels, reliability, availability and implementation-related downtime

Identify which existing systems can be retained, which require modification or replacement, and what new infrastructure would be needed. Classify changes as minor modifications, major retrofit/revamp or new infrastructure, and provide indicative implementation timelines.

4. CO2 requirements

Assess how Green Ammonia integration would change the plant’s CO2 balance. Quantify the reduction in internally available CO2 and any additional requirement for each scenario. Where relevant, examine potential internal and external sources and the technical requirements and resource implications for capture, purification, compression, transport and storage. Consider CO2 quality and impurity constraints.

5. Green Ammonia supply and logistics

Estimate the Green Ammonia requirement for each scenario and assess supply reliability, transport mode and distance, delivery frequency, storage capacity, unloading and transfer systems, safety requirements and associated Infrastructure, resource and operational implications. Consider continuous and intermittent supply arrangements where relevant.

6. Infrastructure and Operational Requirements Assessment

Prepare plant-level estimates for each integration scenario. Infrastructure Assessmentshould cover, as applicable, Green Ammonia receiving and storage facilities, piping and transfer systems, process modifications, CO2 systems, utilities, electrical and control systems, safety measures, civil works, engineering, installation and contingency.

Estimate for Operational Assessment should including Green Ammonia procurement and transport, storage and handling, CO2 procurement and processing, natural gas, electricity, steam, water, maintenance, consumables and additional manpower. State the basis, assumptions and sources used for each estimate, distinguishing fixed and variable operational requirements where possible.

7. Technical Viability and scenario analysis

Develop a plant-level Technical Viability model comparing the existing grey-ammonia baseline with different Green Ammonia integration options. The model should quantify the implications on urea production viability, incremental requirements associated with Green Ammonia integration and resource intensity of emissions reduction across different scenarios.

At a minimum, assess a baseline and low, medium and higher levels of Green Ammonia integration, alongside an alternative technically feasible pathway where applicable. Final scenario definitions should be agreed with IRT during inception.

Undertake sensitivity analysis for key variables, including procurement and supply conditions for Green Ammonia, natural gas, electricity, CO2, transport distance, integration level, plant utilization, and infrastructure and equipment requirements, and ongoing operational resource needs.. The model should allow IRT to change key assumptions and review the resulting impact on urea production, plant operations, resource utilisation and emissions reduction outcomes.

8. Emissions and implementation considerations

Estimate potential emissions reductions under each scenario and identify the main technical, operational, logistical and resource-related constraints to implementation. Based on the analysis, recommend practical integration pathways for the selected plants and identify considerations relevant to wider adoption across India’s existing urea sector.

4. Deliverables, Milestones and Payment Schedule

The consultant will provide the following deliverables

  • Inception report, setting out the methodology, plant selection, data requirements, scenarios and workplan.
  • Plant-level technical assessment, including baseline configurations, integration options, process and utility balances, CO2 requirements, infrastructure needs and retrofit/revamp implications.
  • Infrastructure and Operational Requirements assessment, with transparent assumptions, estimation methods and supporting calculations.
  • Technical Viability model, covering the baseline and agreed integration scenarios, sensitivity analysis and emissions reductions. The model should be editable and usable by IRT.
  • Final report, presenting the findings, plant-level comparisons, key constraints and recommendations for practical Green Ammonia integration.

The assignment is expected to be completed within six months of contract commencement. The consultant should include a detailed workplan in the proposal.

The indicative schedule is

Milestones

Indicative timeline

Inception and methodology

Month 1

Plant data collection and baseline assessment

Months 1-2

Technical and process assessment

Months 2-3

Infrastructure and Operational Requirements assessment

Months 3-4

Technical Viability modelling

Months 3-5

Draft report

Month 5

Final report and model

Month 6

5. Required Qualifications and Experience The assignment is suited to a consulting firm with experience in fertilizersector engineering and Technical Viability assessment.

The firm should demonstrate

  • Experience with ammonia and urea plant engineering, operations or consulting
  • Knowledge of fertilizer process engineering, plant revamps and debottlenecking
  • Experience in Infrastructure and Operational estimation, energy and steam balances, and Technical Viability modelling
  • Experience with Green Ammonia and/or Green Hydrogen projects
  • Knowledge of CO2 capture, purification and utilization
  • Experience in industrial decarbonization and engagement with fertilizer companies and technology licensors Experience with Indian ammonia-urea plants will be strongly preferred.

6. Expected outcomes

The study is expected to provide

  • A plant-level understanding of feasible Green Ammonia integration options across representative existing urea plants
  • Quantified Green Ammonia and additional CO2 requirements under different scenarios
  • Assessment of energy, steam, infrastructure and retrofit/revamp implications
  • Plant-level Infrastructure and Operational Requirements and production resource implications
  • An editable Technical Viability model for testing key assumptions
  • Estimates of potential emissions reductions and identification of implementation barriers
  • Recommendations for practical pathways to scale Green Ammonia integration in India’s existing urea sector

7. Commercial Terms and Payment Conditions

Payment will be made only upon submission and written acceptance of the relevant deliverable(s).

Unless specifically approved, taxes, travel, printing, logistics, software licenses, communication, insurance, and incidental costs should be clearly identified as either included in the fee or reimbursable against prior approval.

Invoices must reference the contract number and be supported by documents required for payment processing.

8. Proposal Submission Requirements

Technical proposal or statement of interest describing the proposed approach and understanding of the assignment

  • Updated CV(s) / team composition
  • Relevant work samples or past project experience
  • Financial proposal with clear cost break-up and taxes
  • Proposed workplan / timeline, if applicable
  • Conflict of interest declaration or NDA or other compliance documents, if requested

9. Selection Criteria

  • Proposals will be evaluated based on technical quality and financial cost.
  • IRT may seek clarifications from applicants during the evaluation process.
  • IRT reserves the right to modify or cancel the RfP process, reject any proposal, or make no award at its sole discretion.
  • Contracts will not be awarded to organisations failing to meet our due diligence criteria.
  • All proposal preparation and submission costs shall be borne by the applicant. IRT will not reimburse these costs.

Additional information

No part of this Request for Proposal shall be construed as an offer document. The acceptance of a proposal does not contractually bind IRT. The consultant must sign definitive contractual documents governing their relationship with IRT. Deadline: 23 rd December 2026 Expression of interest:

All expressions of interest, queries and proposals in response to this RFP must be received via email to the contact below by 23 rd December 2026.

Vibhav. [email protected]

Job posted by World Resources Institute / India Resources Trust, taken from its website. To apply, use the original posting. See the original posting ↗

Job information
Organization
World Resources Institute / India Resources Trust
Location
India
Organization type
Local / national NGO
Contract
Job
Posted
27 November 2026
Deadline
23 December 2026 26 days left

Duty station India

Official travel advice (United Kingdom)
Advice against all travel to parts of the country
Life expectancy
72.2years (2024)
Physicians
0.72per 1,000 people (2020)
Basic drinking water access
95.7 % (2024)
Access to electricity
99.9 % (2024)
GDP per capita
$2,702 (2025)

Full country briefing → Jobs in India →

Public indicators: UK FCDO travel advice, World Bank. They do not replace your organization's security briefing. Sources : FCDO · World Bank.

Practise the interview for this job5 panel questions for this job, written or spoken. Score out of 10 and advice. Free with your account.Start the simulation → New programmeHumanitarian Mini MBAExactly three months to learn how to lead a humanitarian organisation: strategy, finance, compliance, fundraising, supply chain, HR, risk, negotiation and governance. Demanding, numerical and free.12 weeks · 144 hours3 exams · verifiable final certificateSelf-paced or cohortDiscover the Mini MBA → Improve my CV for WRI/IRSend your CV: Lumen rewrites it in NGO format for this position, with your cover letter. Free.Improve my CV →
New jobs by email

New jobs in India by email, every day or every week. Free, one-click unsubscribe.

Choose countries and sectors →

Our free services to apply for this job 100% free

Everything is free: no subscription, no credit card. Only the organisation's official vacancy notice is authoritative.

You will go to the organization's official site. Humanitaires Jobs never asks for money to apply.

⚠ Beware of scams: no genuine humanitarian organization charges application, visa or training fees.

Similar jobs

Project Coordinator

PRERAKGariyaband District, IndiaPosted today
Women encouragedProgramme managementJob
26 days left 23 Dec

Counselor

Iswar SankalpaKolkata, IndiaPosted today
Programme managementJob
26 days left 23 Dec

🎓 Scholarships not to miss

A master's or training to grow in humanitarian work? These scholarships close soon.

All scholarships on ScholarMap →