AI module · complements the 12 weeks · about 4 hours

Finance, grants and compliance with artificial intelligence

Mini MBA Finance and Grants

Module objectives
  • Use AI to prepare consistent proposals and reports, without invented promises or figures.
  • Speed up budget monitoring and anomaly detection while keeping an audit trail.
  • Protect financial data and meet donor requirements.

This module complements the 12 weeks of the programme. It adds no exam: certificates and the diploma are earned as before. Tools are described as known in November 2026; they change quickly.

1Proposals and donor reports

AI helps to:

  • Structure a proposal according to the donor's template and check that each section is covered.
  • Check consistency: does each activity in the workplan have a budget line? does each logframe indicator have a means of verification?
  • Rephrase text that is too long to meet a character limit.
  • Prepare the narrative report from your verified notes and data.

Limits: the tool knows neither your context nor your real capacities. It tends to produce generic wording and over-ambitious promises ("sustainably transform"). An experienced donor spots them. Some donors now ask applicants to declare the use of AI or regulate it: read the call and follow its rules.

2Reading a grant agreement

A grant agreement often runs to dozens of pages plus annexes. AI can produce a table of obligations: reporting dates, cost eligibility rules, budget flexibility thresholds, procurement rules, and clauses on visibility, audit, sanctions and counter-terrorism.

Method: for each obligation, ask for the exact article reference, then check it in the original text. A summary that leaves out a clause (for example the requirement for prior approval for a transfer of more than 15% between headings) can lead to ineligible costs. Use an approved professional account: a grant agreement is often confidential.

3Budget monitoring and variance analysis

Concrete uses:

  • Writing the monitoring formulas: burn rate, variances in value and percentage, end-of-project projection at the current pace.
  • Drafting the variance commentary from your explanations.
  • Preparing a pivot table or script to reconcile the general ledger with the budget.

Example of a requested formula: "burn rate = cumulative expenditure / budget × 100; projection = cumulative expenditure / months elapsed × total duration". Always check the calculation by hand on one line. The final figure in the financial report comes from the accounting system, never from an estimate by the tool.

4Anomaly detection and fraud prevention

Scripts or analysis functions can flag unusual transactions: duplicate invoices (same amount, same supplier, close dates), amounts just below a procurement threshold, recently created suppliers receiving large payments, weekend payments, identical bank details for two suppliers.

These alerts are signals, not evidence. Many are false positives: human review, supporting documents and, if doubt remains, the organisation's investigation procedure are required. Measure the precision of alerts (confirmed alerts / alerts issued) to adjust the rules. Never accuse anyone on the basis of an automated signal.

5Confidentiality and compliance

  • Named salaries, bank details, data of cash transfer recipients: never in a consumer tool.
  • For cash transfers, recipient lists are personal data: apply the data protection policy and the principle of data minimisation.
  • Audit trail: an auditor must be able to redo the calculation. Keep formulas, scripts and file versions.
  • Sanctions screening: use the official lists and the tool approved by the organisation, not a chat assistant that may get a name wrong.

Exercise: budget variances and anomaly alerts

Situation. An 18-month project has a budget of €600,000. In month 9, cumulative expenditure is €240,000. An analysis script issued 40 alerts on the general ledger; after review, 6 are real anomalies.

Questions. 1) Burn rate? 2) End-of-project projection at the current pace? 3) Precision of the alerts? What do you do?

Answer key. 1) 240,000 / 600,000 = 40% at mid-term (50% of the time elapsed): underspending. 2) 240,000 / 9 × 18 = €480,000, i.e. €120,000 unspent if nothing changes: analyse the causes and discuss a revision with the donor early. 3) 6 / 40 = 15%: many false positives; adjust the rules, handle the 6 anomalies through the procedure, with no conclusion about individuals before an investigation.

Key points

  • AI structures a proposal and checks its consistency; you bring the context and realistic commitments.
  • For an agreement: a table of obligations with article references, then verification in the text.
  • Official figures: accounting system and verified formulas, never an estimate by the tool.
  • Anomaly alerts are signals; human review, documents and procedure before any conclusion.
  • Salaries, bank accounts and recipient lists: never in a consumer tool; keep an audit trail.

Self-assessment quiz

6 self-assessment questions, corrected immediately. They do not count towards the exams.

1Budget €600,000, cumulative expenditure €240,000 in month 9 of 18. Projection at the current pace:
240 alerts issued, 6 confirmed. Precision:
3To check that a supplier is not on a sanctions list, you use:
4An AI-generated summary of an agreement must be:
5An alert flags two suppliers with the same bank account. What do you do?
6Why avoid wording such as "sustainably transform the region" suggested by AI?
Going further

The Mini MBA AI and Humanitarian Action (Claude and Gemini) covers these topics in depth over 12 weeks.

See the AI Mini MBA