Week 10 of 12 · 12 hours · Diploma

Donor reporting, change management and communication

Objectives of the week
  • Write accurate, consistent and results-oriented narrative and financial reports, with AI support and systematic checking.
  • Manage contractual changes (reallocations, no-cost extensions, amendments) according to donor rules.
  • Build a project communication plan and clear messages for each audience.

Keep the course at home: free PDF handout with exercises, key takeaways and quiz answers.

Download this lesson as PDF Complete manual (PDF)

1What a donor expects from a report

An interim or final report answers four questions: what have we achieved against the planned results? Why the variances? What have we learned and changed? How was the money used?

Common structure of the narrative report: summary; changes in context; progress by result (indicators with baseline, target, achieved, disaggregation); variances and corrective measures; accountability (feedback and complaints received, responses given); risks; lessons learned; sustainability; annexes (ITT, case studies, photos with consent).

The financial report follows the donor's format strictly, by heading, with variances explained. The project manager and finance reconcile narrative and financial: an output announced as "100% achieved" with a budget line 30% spent will raise questions.

2Writing accurately: accuracy, honesty, results

Writing rules:

  • Every figure has a source (database, ITT, distribution list) and a date;
  • Talk about outcomes before activities: "72% of households report an acceptable food consumption score, against 41% at baseline" rather than "we distributed 3,200 vouchers";
  • Do not embellish: a variance explained and corrected inspires more confidence than a doubtful success; an inaccurate statement may be considered a false declaration;
  • Respect dignity: no miserabilist stories, no photos of identifiable children without informed consent, no information that could expose a person;
  • Correctly attribute results shared with partners or other actors.

3Writing a report with AI, a safe method

  1. Gather validated sources: ITT, review minutes, financial report, anonymised community feedback, decision log.
  2. Give the donor's format and length limits.
  3. Ask for a strictly sourced first draft: "Write the Result 2 section using only these documents; for each figure, give the source document in square brackets; write [TO BE COMPLETED] if information is missing; do not invent any beneficiary quote."
  4. Check line by line every figure and statement, then remove the bracketed references.
  5. Ask for a critical review: "Act as the donor's programme officer: what questions would you ask? What inconsistencies between the narrative and the financial report do you see?"
  6. Final human review by the project manager, finance and management.

Some donors publish rules on the use of AI in proposals and reports: check them, and be transparent if asked. Donors increasingly spot generic texts and unsourced figures.

4Managing contractual changes

The most frequent changes:

  • Budget reallocation between headings: free below a threshold set by the contract (often 10 to 20% of the heading concerned), subject to written approval above it;
  • No-cost extension: extending the duration without increasing the budget; to be requested early, often at least one to three months before the end, with a justification and a revised plan;
  • Change of scope: new sites, new activities, change of targets; almost always requires an amendment;
  • Change of partner or key staff, if the contract mentions them.

The internal procedure follows integrated change control (week 2) and management by exception (week 3): impact analysis, board decision, request to the donor, baseline update after written approval, traceability in the change log. Expenditure incurred on an unapproved change risks being declared ineligible.

5The project communication plan

The communication plan specifies, for each audience: what information, through which channel, how often, by whom. For example:

  • Steering committee: one-page monthly highlight report, quarterly meeting;
  • Donor: contractual reports, rapid alerts in case of significant variance, field visit;
  • Team: weekly meeting, shared Kanban board;
  • Communities: meetings, local radio, posters, in local languages, with information on criteria, dates and the complaints mechanism;
  • Authorities and cluster: coordination meetings, 4W updates.

The number of communication channels in a team grows fast: n × (n − 1) ÷ 2. A team of 6 people has 15 channels; at 12 people, 66. Hence the value of short meetings, shared minutes and a common tool.

6Communicating with AI, for each audience

AI helps adapt the same content: executive summary for management, short message for communities, technical note for the cluster, social media post. Ask for versions by audience, with clear constraints: length, register, words to avoid.

For messages to communities: have them reviewed by native speakers and tested with a few people, especially for languages less present on the internet; machine translation can change the meaning of an eligibility criterion. For public posts: check the donor's visibility rules and your organisation's communication policy, and do not use AI-generated images presented as real photos.

Exercise: reallocation and extension

Situation. Project of the fictitious NGO Tamkin, budget EUR 750,000, 18 months. The contract allows each heading to vary by at most 15% of its initial amount without prior approval. The project manager wants to transfer EUR 26,000 from the "Equipment" heading (EUR 200,000) to the "Training" heading (EUR 120,000). Separately, in month 15, 22% of activities remain to be carried out because access was blocked for two months; the contract requires any extension to be requested at least 2 months before the end.

Task. 1) Variance of each heading? 2) Is approval needed? 3) Last month to request the extension? 4) What does the no-cost extension request contain?

Answer. 1) Equipment: −26,000 ÷ 200,000 = −13%; Training: +26,000 ÷ 120,000 ≈ +21.7%. 2) Yes: the Training heading exceeds 15%. Without approval, at most EUR 18,000 (15% of 120,000) could be transferred. 3) End in month 18, request at the latest by the end of month 16: act immediately, in month 15. 4) Justification (blocked access, documented), remaining activities and revised plan, unchanged budget with updated spending pace, requested duration (for example 3 months), risks and measures, impact on indicators and handover.

Key points

  • A report says what was achieved, why the variances, what was learned and how the money was used.
  • Every figure has a source and a date; never embellish; respect people's dignity.
  • With AI: validated sources, sourced first draft, line-by-line checking, human review.
  • Reallocations above the threshold, extensions and scope changes require the donor's written approval.
  • Communication plan by audience; messages to communities reviewed by native speakers.
A question about this module?

Ask the other participants: they are taking the same course as you.

Ask my question See this module's discussions

💼 Programme management jobs

Put this course into practice: the latest jobs in this field.

See all 1171 Programme management jobs →

Prepare for the written test and interviewA model written test in this field, interview questions with sample answers and the STAR method.See the model test →
Further reading: course references
  1. Project Management Institute (PMI) (2025). A Guide to the Project Management Body of Knowledge (PMBOK Guide), 8th edition. www.pmi.org
  2. Project Management Institute (PMI) (2026). PMP Examination Content Outline. www.pmi.org/certifications/project-management-pmp
  3. PeopleCert (AXELOS) (2023). Managing Successful Projects with PRINCE2, 7th edition. www.peoplecert.org
  4. Ken Schwaber and Jeff Sutherland (2020). The Scrum Guide. scrumguides.org
  5. Group of 17 signatories (2001). Manifesto for Agile Software Development. agilemanifesto.org
  6. PM4NGOs (2020). Project DPro: project management guide for development professionals (PMD Pro 2nd edition). pm4ngos.org
  7. PM4NGOs (2019). MEAL DPro: guide to monitoring, evaluation, accountability and learning. pm4ngos.org
  8. European Commission (2004). Project Cycle Management Guidelines. international-partnerships.ec.europa.eu
  9. United Nations Sustainable Development Group (UNSDG) (2011). Results-Based Management Handbook. unsdg.un.org
  10. CHS Alliance, Groupe URD and Sphere (2024). Core Humanitarian Standard on Quality and Accountability. www.corehumanitarianstandard.org
  11. Sphere Association (2018). The Sphere Handbook. spherestandards.org
  12. Inter-Agency Standing Committee (IASC) (2023). Operational Guidance on Data Responsibility in Humanitarian Action. interagencystandingcommittee.org
  13. ICRC and Brussels Privacy Hub (2020). Handbook on Data Protection in Humanitarian Action (2nd edition). www.icrc.org
  14. National Institute of Standards and Technology (NIST) (2023). AI Risk Management Framework (AI RMF 1.0). www.nist.gov
  15. United Nations (Chief Executives Board) (2022). Principles for the Ethical Use of Artificial Intelligence in the United Nations System. unsceb.org

Weekly quiz

5 demanding questions to check your learning. Answer them all to complete the week.

1How many communication channels does a team of 8 people have?
2A no-cost extension consists of:
3In a report, a flattering but unverifiable statement must be:
4Heading of EUR 50,000, threshold 10%. Maximum incoming transfer without approval:
5An AI-generated image may be published:

← Week 9Week 11 →