ToR - Consultant For Hydrogeological Characterisation, Micro-Watershed Del...

Tomorrow's Foundation

  • Jhargram District, India
  • Consultoría
  • Fecha límite : 10 de diciembre de 2026 (Quedan 15 días)
Postular en el sitio de TF

¿Miembro de la Red? Su CV y sus respuestas están listos en un clic, y la candidatura se añade a su seguimiento.

Perfil buscado en resumen

  • FormaciónMáster

Datos extraídos automáticamente del anuncio: compruébelos en el anuncio oficial.

Texto completo del anuncio

Anuncio redactado en inglés por la organización. Traducir con Google Translate ↗

The consultant shall be responsible for the hydrogeological study and DPR for the full project area of around 50 villages in 5 Gram Panchayats.

List of Gram Panchayats- (Block – Binpur II, Jhargram)

  • Bhelaidiha
  • Shimulpal
  • Bhulaveda (Bhula Bheda)
  • Belpahari
  • Sandapara

The scope of work shall include, but not be limited to, the following.

A0. Inception

  • Review the project proposal, work plan, logical framework and the planned unit targets for water security works.
  • Hold a kick-off meeting with TF and agree the micro-watershed boundaries, priority villages and data-sharing arrangements with the baseline survey agency.
  • Prepare an Inception Report covering methodology, field plan, sampling of wells and test sites, team deployment, timelines and quality assurance.

Component A: Hydrogeological Characterisation and Micro-Watershed Delineation

A1. Desk review and secondary data

  • Collect and review existing data: Central Ground Water Board (CGWB) and State Water Investigation Directorate (SWID), West Bengal reports and aquifer maps, NAQUIM outputs where available, Geological Survey of India maps, block-level groundwater assessment category, rainfall records, any earlier watershed DPRs for the area, and the water-source inventory and water quality data from the project's baseline survey.
  • Obtain base layers: Survey of India toposheets (1:50,000), a digital elevation model (CartoDEM / SRTM, 30 m or finer), recent satellite imagery, land use/land cover, soil and geomorphology layers (e.g., Bhuvan / NRSC).

A2. Micro-watershed delineation and drainage mapping

  • Delineate watershed and micro-watershed boundaries from the DEM, validated against toposheets and field observation; reconcile with official micro-watershed codes where they exist.
  • Map the full drainage network and classify every drainage line by Strahler stream order, with slope, length and catchment area for each segment.
  • Divide each micro-watershed into ridge, mid-slope and valley zones to support ridge-to-valley treatment planning.
  • Produce thematic maps for each micro-watershed: drainage, slope, contour (at an interval suitable for structure design), geology, geomorphology, lineaments, soils and land use.

A3. Hydrogeological field investigation

  • Traverse the main drainage lines on foot and record lithology, rock outcrops, weathered-zone thickness, fractures, lineaments, dykes and stream-bed material at regular intervals.
  • Inventory existing open wells, bore wells and hand pumps (target: at least 200 wells across the 40 villages), recording location (GPS), depth, depth to water, construction, yield, use and seasonality.
  • Measure pre- and post-monsoon water levels in a network of key observation wells, and establish this network for long-term monitoring by the Foundation.
  • Conduct infiltration tests at representative sites across major soil and geology units (minimum 20 tests).
  • Carry out geophysical surveys (vertical electrical sounding or electrical resistivity tomography) at priority sites, particularly proposed injection-well and check-dam locations (minimum 40 soundings).
  • Collect and test groundwater samples at a NABL-accredited laboratory for basic potability and recharge-relevant parameters (pH, EC/TDS, hardness, chloride, nitrate, fluoride, iron, arsenic where relevant) from at least 40 sources, avoiding duplication with the baseline survey's testing.
  • Record existing water harvesting and recharge structures, their condition and performance.

A4. Aquifer characterisation and recharge profile

  • Define the aquifer type(s) (e.g., unconfined weathered zone, fractured hard rock, alluvial, confined), with geometry, thickness and water-bearing properties, illustrated with hydrogeological cross-sections.
  • Estimate the groundwater balance for each micro-watershed (rainfall, runoff, recharge, draft and stage of extraction) using an approach consistent with the GEC-2015 methodology.
  • Identify and map recharge zones, discharge zones and areas of over-extraction or water-quality concern.
  • Prepare a recharge-potential zonation map combining field data with weighted GIS layers.

A5. Site identification and prioritisation

  • Identify candidate sites for each structure type along drainage lines, matched to stream order, slope, geology and aquifer response, for example:
  • Ridge and upper reaches (1st–2nd order): trenches, gully plugs, loose boulder structures.
  • Mid reaches (2nd–3rd order): recharge trenches, percolation ponds, farm ponds.
  • Lower reaches (3rd–4th order): check dams, nala bunds, recharge shafts or injection wells where a permeable zone is confirmed.
  • Rank sites by expected recharge benefit, downstream beneficiaries, land availability and community preference.
  • Validate shortlisted sites with Gram Panchayats and user groups, and record land ownership and consent status.

Component B: Detailed Project Report (DPR) Preparation

B1. Intervention plan

  • Prepare a micro-watershed-wise treatment plan covering area treatment and drainage-line treatment from ridge to valley.
  • For each structure: unique ID, GPS location, survey number or land details, drainage order, type, purpose and justification from the hydrogeological findings.

B2. Engineering design

  • Carry out a topographic survey at every shortlisted structure site (levels, cross- and longitudinal sections).
  • Calculate catchment yield, design peak flood and storage capacity for each structure.
  • Prepare designs and drawings: plan, sections, dimensions, materials, foundation depth and spillway or overflow provision.
  • For injection or recharge wells: depth, casing, screen position, filter design and silt-trap arrangement, based on the geophysical and lithological data.
  • Follow applicable standards: CGWB Master Plan for Artificial Recharge to Groundwater, relevant Indian Standard codes, and the Common Guidelines for Watershed Development Projects / WDC-PMKSY 2.0 norms, or the State's own technical guidelines where these apply.

B3. Quantities and costs

  • Prepare bills of quantities and cost estimates for each structure using the current West Bengal Schedule of Rates (PWD / Irrigation & Waterways, as applicable) and MGNREGA rates, where applicable.
  • Summarise the budget by micro-watershed, structure type and implementation phase.
  • Identify components suitable for convergence with government schemes (e.g., MGNREGA, WDC-PMKSY, Jal Shakti Abhiyan, Atal Bhujal Yojana where applicable).

B4. Expected impact and monitoring

  • Estimate the additional storage and recharge volume, the area benefiting from irrigation and the households benefiting, for each structure and in total.
  • Propose a monitoring framework: observation wells, measurement frequency, indicators and a simple data format the Foundation's field staff can maintain.
  • Include an operation and maintenance plan, with roles for user groups and Gram Panchayats.

B5. Implementation and quality guidance

  • Set out a phased implementation schedule that sequences works ridge to valley and fits the working season.
  • Provide a quality supervision checklist for each structure type: critical dimensions, materials and stage-wise checks.
  • Note risks such as land, siltation and water quality, with mitigation measures.

B6. Stakeholder consultation and presentation

  • Present draft findings to the Foundation, Gram Panchayats and relevant government departments (e.g., Jhargram Zilla Parishad, Binpur-II Block Development Office, Water Resources Investigation & Development Department, Panchayat & Rural Development Department, Public Health Engineering Department).
  • Incorporate feedback and support the Foundation in sharing the final DPR for planning integration.

Responsabilidades

All reports in English, in editable (Word/Excel) and PDF formats; all maps and spatial data as GIS files (shapefile/GeoPackage, WGS 84) with metadata. Payment is linked to TF's acceptance of each deliverable.

Deliverable

Key contents

Payment

1

Inception Report

Methodology, field plan, well and test-site sampling, team, work plan, QA

10%

2

Hydrogeological Characterisation and Micro-Watershed Report

  • Micro-watershed boundaries and drainage maps by stream order
  • Thematic maps
  • Well inventory
  • Post-monsoon water levels
  • Infiltration, geophysical and water quality results
  • Aquifer typology and cross-sections
  • Water balance
  • Recharge-potential zonation

25%

3

Site Prioritisation Package

Ranked, GPS-tagged site list per structure type with justification; Gram Panchayat validation and land consent status; Year-1 priority sites flagged

(with 4)

4

Draft DPR

Structure-wise designs, drawings, BoQs and SoR-based estimates; budget by micro-watershed and phase; convergence mapping; impact estimates; monitoring, O&M and quality supervision plans

30%

5

Validation Presentation

Presentation of findings and draft DPR to TF, Gram Panchayats and district/block officials

6

Final DPR

Final DPR incorporating feedback, with annexures, drawings, GIS database, raw field data, photographs and a summary presentation

25%

7

Pre-monsoon Addendum

Pre-monsoon water levels from the observation network, seasonal fluctuation analysis and any resulting site revisions

10%

Oferta publicada por Tomorrow's Foundation, tomada de su sitio web. Para postular, use el anuncio original. Ver el anuncio original ↗

Ficha de la oferta
Organización
Tomorrow's Foundation
Lugar
Jhargram District, India
Tipo de organización
ONG local / nacional
Contrato
Consultoría
Publicada el
25 de noviembre de 2026
Fecha límite
10 de diciembre de 2026 Quedan 15 días

Lugar de destino Jhargram District, India

Consejos oficiales de viaje (Reino Unido)
Se desaconseja todo viaje a algunas regiones
Esperanza de vida
72,2años (2024)
Médicos
0,72por 1.000 habitantes (2020)
Acceso básico a agua potable
95,7 % (2024)
Acceso a la electricidad
99,9 % (2024)
PIB por habitante
2702 US$ (2025)

Briefing completo del país → Ofertas en India →

Indicadores públicos: consejos de viaje del FCDO británico, Banco Mundial. No sustituyen el briefing de seguridad de su organización. Fuentes : FCDO · Banco Mundial.

Simule la entrevista para este puesto5 preguntas del jurado para este puesto, por escrito o en voz alta. Nota sobre 10 y consejos. Gratis con su cuenta.Empezar la simulación → Nuevo programaMini MBA humanitarioTres meses exactos para aprender a dirigir una organización humanitaria: estrategia, finanzas, cumplimiento, captación de fondos, cadena de suministro, RR. HH., riesgos, negociación y gobernanza. Exigente, con cifras y gratuito.12 semanas · 144 horas3 exámenes · certificado final verificableRitmo libre o promociónDescubrir el Mini MBA → Mejorar mi CV para TFEnvíe su CV: Lumen lo reescribe en formato ONG para este puesto, con su carta de motivación. Gratis.Mejorar mi CV →
Las nuevas ofertas por e-mail

Las nuevas ofertas en India por e-mail, cada día o cada semana. Gratis, baja con un clic.

Elegir países y áreas →

Nuestros servicios gratuitos para postular a esta oferta 100 % gratis

Todo es gratuito: sin suscripción ni tarjeta bancaria. Solo el anuncio oficial de la organización es válido.

Irá al sitio oficial de la organización. Humanitaires Jobs nunca pide dinero para postular.

⚠ Cuidado con las estafas: ninguna organización humanitaria seria cobra gastos de solicitud, de visado o de formación.

Ofertas similares

🎓 Becas que no hay que perderse

¿Un máster o una formación para avanzar en lo humanitario? Estas becas cierran pronto.

Todas las becas en ScholarMap →