ToR - Consultant For Hydrogeological Characterisation, Micro-Watershed Del...
¿Miembro de la Red? Su CV y sus respuestas están listos en un clic, y la candidatura se añade a su seguimiento.
Agente de candidatura Lumen
Cuenta gratuitaLumen lee esta oferta y su CV, y prepara un CV y una carta adaptados a este puesto. Usted revisa, corrige y postula.
- Las palabras clave de la oferta, solo cuando su trayectoria lo justifica
- Nada inventado: lo que falta se marca [por completar]
- Privado: nunca publicado ni enviado a la organización
Perfil buscado en resumen
- FormaciónMáster
Datos extraídos automáticamente del anuncio: compruébelos en el anuncio oficial.
Texto completo del anuncio
The consultant shall be responsible for the hydrogeological study and DPR for the full project area of around 50 villages in 5 Gram Panchayats.
List of Gram Panchayats- (Block – Binpur II, Jhargram)
- Bhelaidiha
- Shimulpal
- Bhulaveda (Bhula Bheda)
- Belpahari
- Sandapara
The scope of work shall include, but not be limited to, the following.
A0. Inception
- Review the project proposal, work plan, logical framework and the planned unit targets for water security works.
- Hold a kick-off meeting with TF and agree the micro-watershed boundaries, priority villages and data-sharing arrangements with the baseline survey agency.
- Prepare an Inception Report covering methodology, field plan, sampling of wells and test sites, team deployment, timelines and quality assurance.
Component A: Hydrogeological Characterisation and Micro-Watershed Delineation
A1. Desk review and secondary data
- Collect and review existing data: Central Ground Water Board (CGWB) and State Water Investigation Directorate (SWID), West Bengal reports and aquifer maps, NAQUIM outputs where available, Geological Survey of India maps, block-level groundwater assessment category, rainfall records, any earlier watershed DPRs for the area, and the water-source inventory and water quality data from the project's baseline survey.
- Obtain base layers: Survey of India toposheets (1:50,000), a digital elevation model (CartoDEM / SRTM, 30 m or finer), recent satellite imagery, land use/land cover, soil and geomorphology layers (e.g., Bhuvan / NRSC).
A2. Micro-watershed delineation and drainage mapping
- Delineate watershed and micro-watershed boundaries from the DEM, validated against toposheets and field observation; reconcile with official micro-watershed codes where they exist.
- Map the full drainage network and classify every drainage line by Strahler stream order, with slope, length and catchment area for each segment.
- Divide each micro-watershed into ridge, mid-slope and valley zones to support ridge-to-valley treatment planning.
- Produce thematic maps for each micro-watershed: drainage, slope, contour (at an interval suitable for structure design), geology, geomorphology, lineaments, soils and land use.
A3. Hydrogeological field investigation
- Traverse the main drainage lines on foot and record lithology, rock outcrops, weathered-zone thickness, fractures, lineaments, dykes and stream-bed material at regular intervals.
- Inventory existing open wells, bore wells and hand pumps (target: at least 200 wells across the 40 villages), recording location (GPS), depth, depth to water, construction, yield, use and seasonality.
- Measure pre- and post-monsoon water levels in a network of key observation wells, and establish this network for long-term monitoring by the Foundation.
- Conduct infiltration tests at representative sites across major soil and geology units (minimum 20 tests).
- Carry out geophysical surveys (vertical electrical sounding or electrical resistivity tomography) at priority sites, particularly proposed injection-well and check-dam locations (minimum 40 soundings).
- Collect and test groundwater samples at a NABL-accredited laboratory for basic potability and recharge-relevant parameters (pH, EC/TDS, hardness, chloride, nitrate, fluoride, iron, arsenic where relevant) from at least 40 sources, avoiding duplication with the baseline survey's testing.
- Record existing water harvesting and recharge structures, their condition and performance.
A4. Aquifer characterisation and recharge profile
- Define the aquifer type(s) (e.g., unconfined weathered zone, fractured hard rock, alluvial, confined), with geometry, thickness and water-bearing properties, illustrated with hydrogeological cross-sections.
- Estimate the groundwater balance for each micro-watershed (rainfall, runoff, recharge, draft and stage of extraction) using an approach consistent with the GEC-2015 methodology.
- Identify and map recharge zones, discharge zones and areas of over-extraction or water-quality concern.
- Prepare a recharge-potential zonation map combining field data with weighted GIS layers.
A5. Site identification and prioritisation
- Identify candidate sites for each structure type along drainage lines, matched to stream order, slope, geology and aquifer response, for example:
- Ridge and upper reaches (1st–2nd order): trenches, gully plugs, loose boulder structures.
- Mid reaches (2nd–3rd order): recharge trenches, percolation ponds, farm ponds.
- Lower reaches (3rd–4th order): check dams, nala bunds, recharge shafts or injection wells where a permeable zone is confirmed.
- Rank sites by expected recharge benefit, downstream beneficiaries, land availability and community preference.
- Validate shortlisted sites with Gram Panchayats and user groups, and record land ownership and consent status.
Component B: Detailed Project Report (DPR) Preparation
B1. Intervention plan
- Prepare a micro-watershed-wise treatment plan covering area treatment and drainage-line treatment from ridge to valley.
- For each structure: unique ID, GPS location, survey number or land details, drainage order, type, purpose and justification from the hydrogeological findings.
B2. Engineering design
- Carry out a topographic survey at every shortlisted structure site (levels, cross- and longitudinal sections).
- Calculate catchment yield, design peak flood and storage capacity for each structure.
- Prepare designs and drawings: plan, sections, dimensions, materials, foundation depth and spillway or overflow provision.
- For injection or recharge wells: depth, casing, screen position, filter design and silt-trap arrangement, based on the geophysical and lithological data.
- Follow applicable standards: CGWB Master Plan for Artificial Recharge to Groundwater, relevant Indian Standard codes, and the Common Guidelines for Watershed Development Projects / WDC-PMKSY 2.0 norms, or the State's own technical guidelines where these apply.
B3. Quantities and costs
- Prepare bills of quantities and cost estimates for each structure using the current West Bengal Schedule of Rates (PWD / Irrigation & Waterways, as applicable) and MGNREGA rates, where applicable.
- Summarise the budget by micro-watershed, structure type and implementation phase.
- Identify components suitable for convergence with government schemes (e.g., MGNREGA, WDC-PMKSY, Jal Shakti Abhiyan, Atal Bhujal Yojana where applicable).
B4. Expected impact and monitoring
- Estimate the additional storage and recharge volume, the area benefiting from irrigation and the households benefiting, for each structure and in total.
- Propose a monitoring framework: observation wells, measurement frequency, indicators and a simple data format the Foundation's field staff can maintain.
- Include an operation and maintenance plan, with roles for user groups and Gram Panchayats.
B5. Implementation and quality guidance
- Set out a phased implementation schedule that sequences works ridge to valley and fits the working season.
- Provide a quality supervision checklist for each structure type: critical dimensions, materials and stage-wise checks.
- Note risks such as land, siltation and water quality, with mitigation measures.
B6. Stakeholder consultation and presentation
- Present draft findings to the Foundation, Gram Panchayats and relevant government departments (e.g., Jhargram Zilla Parishad, Binpur-II Block Development Office, Water Resources Investigation & Development Department, Panchayat & Rural Development Department, Public Health Engineering Department).
- Incorporate feedback and support the Foundation in sharing the final DPR for planning integration.
Responsabilidades
All reports in English, in editable (Word/Excel) and PDF formats; all maps and spatial data as GIS files (shapefile/GeoPackage, WGS 84) with metadata. Payment is linked to TF's acceptance of each deliverable.
Deliverable
Key contents
Payment
1
Inception Report
Methodology, field plan, well and test-site sampling, team, work plan, QA
10%
2
Hydrogeological Characterisation and Micro-Watershed Report
- Micro-watershed boundaries and drainage maps by stream order
- Thematic maps
- Well inventory
- Post-monsoon water levels
- Infiltration, geophysical and water quality results
- Aquifer typology and cross-sections
- Water balance
- Recharge-potential zonation
25%
3
Site Prioritisation Package
Ranked, GPS-tagged site list per structure type with justification; Gram Panchayat validation and land consent status; Year-1 priority sites flagged
(with 4)
4
Draft DPR
Structure-wise designs, drawings, BoQs and SoR-based estimates; budget by micro-watershed and phase; convergence mapping; impact estimates; monitoring, O&M and quality supervision plans
30%
5
Validation Presentation
Presentation of findings and draft DPR to TF, Gram Panchayats and district/block officials
6
Final DPR
Final DPR incorporating feedback, with annexures, drawings, GIS database, raw field data, photographs and a summary presentation
25%
7
Pre-monsoon Addendum
Pre-monsoon water levels from the observation network, seasonal fluctuation analysis and any resulting site revisions
10%
Oferta publicada por Tomorrow's Foundation, tomada de su sitio web. Para postular, use el anuncio original. Ver el anuncio original ↗
Ficha de la oferta
- Organización
- Tomorrow's Foundation
- Lugar
- Jhargram District, India
- Tipo de organización
- ONG local / nacional
- Contrato
- Consultoría
- Publicada el
- 25 de noviembre de 2026
- Fecha límite
- 10 de diciembre de 2026 Quedan 15 días
Lugar de destino Jhargram District, India
- Consejos oficiales de viaje (Reino Unido)
- Se desaconseja todo viaje a algunas regiones
- Esperanza de vida
- 72,2años (2024)
- Médicos
- 0,72por 1.000 habitantes (2020)
- Acceso básico a agua potable
- 95,7 % (2024)
- Acceso a la electricidad
- 99,9 % (2024)
- PIB por habitante
- 2702 US$ (2025)
Briefing completo del país → Ofertas en India →
Indicadores públicos: consejos de viaje del FCDO británico, Banco Mundial. No sustituyen el briefing de seguridad de su organización. Fuentes : FCDO · Banco Mundial.
Lumen, su experto en candidaturas
Servicios profesionales gratuitos para postular a esta oferta, listos en segundos.
Carta, CV, respuestas de entrevista y prueba se redactan en el idioma de su candidatura. Los consejos se mantienen en español.
Lumen trabaja con el texto de esta oferta. Verifique siempre el anuncio oficial y postule en el sitio de la organización antes de la fecha límite.
Las nuevas ofertas en India por e-mail, cada día o cada semana. Gratis, baja con un clic.
Elegir países y áreas →Nuestros servicios gratuitos para postular a esta oferta 100 % gratis
Todo es gratuito: sin suscripción ni tarjeta bancaria. Solo el anuncio oficial de la organización es válido.
En la Red Humanitaria, miembros trabajan en Agua, saneamiento e higiene. Conectar con ellos →
Irá al sitio oficial de la organización. Humanitaires Jobs nunca pide dinero para postular.
⚠ Cuidado con las estafas: ninguna organización humanitaria seria cobra gastos de solicitud, de visado o de formación.
Ofertas similares
🎓 Becas que no hay que perderse
¿Un máster o una formación para avanzar en lo humanitario? Estas becas cierran pronto.