ToR - Consultant For Hydrogeological Characterisation, Micro-Watershed Del...

Tomorrow's Foundation

  • Jhargram District, Inde
  • Consultance
  • Date limite : 10 décembre 2026 (J-15)
Postuler sur le site de TF

Membre du Réseau ? Votre CV et vos réponses sont prêts en un clic, et la candidature s'ajoute à votre suivi.

Profil demandé en bref

  • DiplômeMaster

Repères relevés automatiquement dans l'annonce : vérifiez-les dans l'annonce officielle.

Texte complet de l'annonce

Annonce rédigée en anglais par l'organisation. Traduire avec Google Traduction ↗

The consultant shall be responsible for the hydrogeological study and DPR for the full project area of around 50 villages in 5 Gram Panchayats.

List of Gram Panchayats- (Block – Binpur II, Jhargram)

  • Bhelaidiha
  • Shimulpal
  • Bhulaveda (Bhula Bheda)
  • Belpahari
  • Sandapara

The scope of work shall include, but not be limited to, the following.

A0. Inception

  • Review the project proposal, work plan, logical framework and the planned unit targets for water security works.
  • Hold a kick-off meeting with TF and agree the micro-watershed boundaries, priority villages and data-sharing arrangements with the baseline survey agency.
  • Prepare an Inception Report covering methodology, field plan, sampling of wells and test sites, team deployment, timelines and quality assurance.

Component A: Hydrogeological Characterisation and Micro-Watershed Delineation

A1. Desk review and secondary data

  • Collect and review existing data: Central Ground Water Board (CGWB) and State Water Investigation Directorate (SWID), West Bengal reports and aquifer maps, NAQUIM outputs where available, Geological Survey of India maps, block-level groundwater assessment category, rainfall records, any earlier watershed DPRs for the area, and the water-source inventory and water quality data from the project's baseline survey.
  • Obtain base layers: Survey of India toposheets (1:50,000), a digital elevation model (CartoDEM / SRTM, 30 m or finer), recent satellite imagery, land use/land cover, soil and geomorphology layers (e.g., Bhuvan / NRSC).

A2. Micro-watershed delineation and drainage mapping

  • Delineate watershed and micro-watershed boundaries from the DEM, validated against toposheets and field observation; reconcile with official micro-watershed codes where they exist.
  • Map the full drainage network and classify every drainage line by Strahler stream order, with slope, length and catchment area for each segment.
  • Divide each micro-watershed into ridge, mid-slope and valley zones to support ridge-to-valley treatment planning.
  • Produce thematic maps for each micro-watershed: drainage, slope, contour (at an interval suitable for structure design), geology, geomorphology, lineaments, soils and land use.

A3. Hydrogeological field investigation

  • Traverse the main drainage lines on foot and record lithology, rock outcrops, weathered-zone thickness, fractures, lineaments, dykes and stream-bed material at regular intervals.
  • Inventory existing open wells, bore wells and hand pumps (target: at least 200 wells across the 40 villages), recording location (GPS), depth, depth to water, construction, yield, use and seasonality.
  • Measure pre- and post-monsoon water levels in a network of key observation wells, and establish this network for long-term monitoring by the Foundation.
  • Conduct infiltration tests at representative sites across major soil and geology units (minimum 20 tests).
  • Carry out geophysical surveys (vertical electrical sounding or electrical resistivity tomography) at priority sites, particularly proposed injection-well and check-dam locations (minimum 40 soundings).
  • Collect and test groundwater samples at a NABL-accredited laboratory for basic potability and recharge-relevant parameters (pH, EC/TDS, hardness, chloride, nitrate, fluoride, iron, arsenic where relevant) from at least 40 sources, avoiding duplication with the baseline survey's testing.
  • Record existing water harvesting and recharge structures, their condition and performance.

A4. Aquifer characterisation and recharge profile

  • Define the aquifer type(s) (e.g., unconfined weathered zone, fractured hard rock, alluvial, confined), with geometry, thickness and water-bearing properties, illustrated with hydrogeological cross-sections.
  • Estimate the groundwater balance for each micro-watershed (rainfall, runoff, recharge, draft and stage of extraction) using an approach consistent with the GEC-2015 methodology.
  • Identify and map recharge zones, discharge zones and areas of over-extraction or water-quality concern.
  • Prepare a recharge-potential zonation map combining field data with weighted GIS layers.

A5. Site identification and prioritisation

  • Identify candidate sites for each structure type along drainage lines, matched to stream order, slope, geology and aquifer response, for example:
  • Ridge and upper reaches (1st–2nd order): trenches, gully plugs, loose boulder structures.
  • Mid reaches (2nd–3rd order): recharge trenches, percolation ponds, farm ponds.
  • Lower reaches (3rd–4th order): check dams, nala bunds, recharge shafts or injection wells where a permeable zone is confirmed.
  • Rank sites by expected recharge benefit, downstream beneficiaries, land availability and community preference.
  • Validate shortlisted sites with Gram Panchayats and user groups, and record land ownership and consent status.

Component B: Detailed Project Report (DPR) Preparation

B1. Intervention plan

  • Prepare a micro-watershed-wise treatment plan covering area treatment and drainage-line treatment from ridge to valley.
  • For each structure: unique ID, GPS location, survey number or land details, drainage order, type, purpose and justification from the hydrogeological findings.

B2. Engineering design

  • Carry out a topographic survey at every shortlisted structure site (levels, cross- and longitudinal sections).
  • Calculate catchment yield, design peak flood and storage capacity for each structure.
  • Prepare designs and drawings: plan, sections, dimensions, materials, foundation depth and spillway or overflow provision.
  • For injection or recharge wells: depth, casing, screen position, filter design and silt-trap arrangement, based on the geophysical and lithological data.
  • Follow applicable standards: CGWB Master Plan for Artificial Recharge to Groundwater, relevant Indian Standard codes, and the Common Guidelines for Watershed Development Projects / WDC-PMKSY 2.0 norms, or the State's own technical guidelines where these apply.

B3. Quantities and costs

  • Prepare bills of quantities and cost estimates for each structure using the current West Bengal Schedule of Rates (PWD / Irrigation & Waterways, as applicable) and MGNREGA rates, where applicable.
  • Summarise the budget by micro-watershed, structure type and implementation phase.
  • Identify components suitable for convergence with government schemes (e.g., MGNREGA, WDC-PMKSY, Jal Shakti Abhiyan, Atal Bhujal Yojana where applicable).

B4. Expected impact and monitoring

  • Estimate the additional storage and recharge volume, the area benefiting from irrigation and the households benefiting, for each structure and in total.
  • Propose a monitoring framework: observation wells, measurement frequency, indicators and a simple data format the Foundation's field staff can maintain.
  • Include an operation and maintenance plan, with roles for user groups and Gram Panchayats.

B5. Implementation and quality guidance

  • Set out a phased implementation schedule that sequences works ridge to valley and fits the working season.
  • Provide a quality supervision checklist for each structure type: critical dimensions, materials and stage-wise checks.
  • Note risks such as land, siltation and water quality, with mitigation measures.

B6. Stakeholder consultation and presentation

  • Present draft findings to the Foundation, Gram Panchayats and relevant government departments (e.g., Jhargram Zilla Parishad, Binpur-II Block Development Office, Water Resources Investigation & Development Department, Panchayat & Rural Development Department, Public Health Engineering Department).
  • Incorporate feedback and support the Foundation in sharing the final DPR for planning integration.

Responsabilités

All reports in English, in editable (Word/Excel) and PDF formats; all maps and spatial data as GIS files (shapefile/GeoPackage, WGS 84) with metadata. Payment is linked to TF's acceptance of each deliverable.

Deliverable

Key contents

Payment

1

Inception Report

Methodology, field plan, well and test-site sampling, team, work plan, QA

10%

2

Hydrogeological Characterisation and Micro-Watershed Report

  • Micro-watershed boundaries and drainage maps by stream order
  • Thematic maps
  • Well inventory
  • Post-monsoon water levels
  • Infiltration, geophysical and water quality results
  • Aquifer typology and cross-sections
  • Water balance
  • Recharge-potential zonation

25%

3

Site Prioritisation Package

Ranked, GPS-tagged site list per structure type with justification; Gram Panchayat validation and land consent status; Year-1 priority sites flagged

(with 4)

4

Draft DPR

Structure-wise designs, drawings, BoQs and SoR-based estimates; budget by micro-watershed and phase; convergence mapping; impact estimates; monitoring, O&M and quality supervision plans

30%

5

Validation Presentation

Presentation of findings and draft DPR to TF, Gram Panchayats and district/block officials

6

Final DPR

Final DPR incorporating feedback, with annexures, drawings, GIS database, raw field data, photographs and a summary presentation

25%

7

Pre-monsoon Addendum

Pre-monsoon water levels from the observation network, seasonal fluctuation analysis and any resulting site revisions

10%

Annonce publiée par Tomorrow's Foundation, reprise de son site. Pour postuler, utilisez l'annonce originale. Voir l'annonce originale ↗

Fiche de l'offre
Organisation
Tomorrow's Foundation
Lieu
Jhargram District, Inde
Type d'organisation
ONG locale / nationale
Contrat
Consultance
Publiée le
25 novembre 2026
Date limite
10 décembre 2026 J-15

Lieu d'affectation Jhargram District, Inde

Conseils officiels aux voyageurs (Royaume-Uni)
Tout déplacement déconseillé dans certaines régions
Espérance de vie
72,2ans (2024)
Médecins
0,72pour 1 000 habitants (2020)
Accès à l'eau potable de base
95,7 % (2024)
Accès à l'électricité
99,9 % (2024)
PIB par habitant
2 702 $US (2025)

Briefing complet du pays → Offres en Inde →

Repères publics : conseils aux voyageurs du FCDO britannique, Banque mondiale. Ils ne remplacent pas le briefing sécurité de votre organisation. Sources : FCDO · Banque mondiale.

Simulez l'entretien pour ce poste5 questions du jury pour ce poste, à l'écrit ou à voix haute. Note sur 10 et conseils. Gratuit avec votre compte.Commencer la simulation → Nouveau programmeMini MBA humanitaireTrois mois exactement pour apprendre à diriger une organisation humanitaire : stratégie, finance, conformité, levée de fonds, supply chain, RH, risques, négociation et gouvernance. Exigeant, chiffré et gratuit.12 semaines · 144 heures3 examens · certificat final vérifiableRythme libre ou promotionDécouvrir le Mini MBA → Améliorer mon CV pour TFEnvoyez votre CV : Lumen le réécrit au format ONG pour ce poste, avec votre lettre de motivation. Gratuit.Améliorer mon CV →
Les nouvelles offres par e-mail

Les nouvelles offres en Inde par e-mail, chaque jour ou chaque semaine. Gratuit, désinscription en un clic.

Choisir mes pays et domaines →

Nos services gratuits pour postuler à cette offre 100 % gratuit

Tout est gratuit : aucun abonnement, aucune carte bancaire. Seule l'annonce officielle de l'organisation fait foi.

Vous allez sur le site officiel de l'organisation. Humanitaires Jobs ne demande jamais d'argent pour postuler.

⚠ Attention aux arnaques : aucune organisation humanitaire sérieuse ne demande de frais de dossier, de visa ou de formation pour un recrutement.

Offres similaires

🎓 Bourses d'études à ne pas manquer

Un master ou une formation pour progresser dans l'humanitaire ? Ces bourses ferment bientôt.

Toutes les bourses sur ScholarMap →