Week 3 of 12 · 12 hours · Month 1

Buying right: procurement principles, thresholds and procedures

Objectives of the week
  • Apply the principles of humanitarian procurement: transparency, competition, best value for money, ethics and accountability.
  • Choose the right procedure according to value, urgency and market, and build a complete procurement file.
  • Write specifications and evaluation criteria that allow a fair and defensible decision.

Keep the course at home: free PDF handout with exercises, key takeaways and quiz answers.

Download this lesson as PDF Complete manual (PDF)

1The principles

Humanitarian procurement spends the money of donors and contributors on behalf of the people being assisted. It rests on principles shared by most organisations:

  • Best value for money: not necessarily the lowest price, but the best combination of quality, lead time, total cost and sustainability.
  • Competition that is effective and proportionate to the value.
  • Transparency and fairness: the same information and the same rules for all suppliers.
  • Segregation of duties: the person who requests is not the person who chooses alone, nor the person who receives alone.
  • No conflict of interest: written declaration by the members of the procurement committee.
  • Ethics and compliance: no sanctioned suppliers, no child labour, compliance with donor rules.
  • Traceability: every decision is documented in a file that an auditor can understand on their own.

2Thresholds and procedures

Each organisation sets thresholds that determine the procedure. A common scale (amounts vary between organisations and donors, who sometimes impose stricter thresholds):

Estimated valueProcedureIndicative timeframe
Less than 1,000 USDDirect purchase, one quotation or a simple comparison1 to 3 days
1,000 to 10,000 USDRequest for quotation: at least 3 written quotations1 to 2 weeks
10,000 to 100,000 USDRestricted or national tender, evaluation committee3 to 6 weeks
More than 100,000 USDOpen tender (national or international), committee, often headquarters approval6 to 12 weeks

The threshold applies to the total value of the need, not to each order: 5 orders of 9,000 USD for the same need make up a purchase of 45,000 USD (splitting is prohibited).

Controlled exceptions: single source (sole supplier justified on technical grounds), emergency procedures triggered by management for a limited period, purchases through an existing framework agreement. Each exception is justified in writing and approved at the right level.

3The procurement file

The procurement file follows the purchase from start to finish. Minimum content:

  • Signed purchase request, with specifications, quantities, budget line and project code.
  • Budget check by finance.
  • Competition documents: request for quotation or tender dossier, list of suppliers consulted, proof of dispatch or publication.
  • Offers received, including those rejected, and the bid opening record.
  • Comparative table and evaluation report, signed by the committee, with the declarations of no conflict of interest.
  • Checks on the selected supplier: sanctions lists, legal registration.
  • Purchase order or contract, signed according to the delegation of authority table.
  • Delivery note and goods received note (quantity and quality), invoice, proof of payment.

An incomplete file is the most frequent cause of costs declared ineligible in an audit, even when the purchase was honest.

4Writing specifications

Good specifications describe the need in a precise, measurable and neutral way:

  • Functional: what the item must do (filter 20 litres per day, withstand 3 rainy seasons).
  • Technical: dimensions, materials, standards (for example the standard specification catalogues of the major organisations, ISO standards, the WHO essential medicines lists).
  • Packaging and marking: weight per package, palletisation, labelling in the local language.
  • Delivery: place, date, Incoterm, documents.

Common pitfalls: naming a brand (which excludes competition; add "or equivalent"), specifications that are too vague (offers impossible to compare), or too strict without reason (only one possible supplier). Specifications are drawn up with the programme team and, for technical items, with a specialist (health, water, shelter).

5Criteria and evaluation grid

Criteria are set before offers are received and announced to suppliers. Two methods:

  • Lowest-priced compliant offer: administrative and technical compliance is checked (yes or no), then the lowest price among compliant offers is selected. Simple, suited to standard items.
  • Weighted scoring: technical and financial criteria with weights. Suited to services, works and complex items.

Weighted scoring example (technical 60%, price 40%). Financial score = lowest price / price of the offer × 40.

SupplierTechnical score /60PricePrice score /40Total
A5280,00040.092.0
B5890,00035.693.6
C4070,000(eliminated: technical score below the minimum of 42)–

C is the cheapest but is eliminated by the announced technical threshold; the lowest price among the retained offers is therefore 80,000. B wins narrowly thanks to its technical quality. A committee cannot change the criteria or weights after the offers have been opened.

6Ethics, conflicts of interest and suppliers

Procurement is the area with the highest fraud risk. The basic rules:

  • Every committee member declares in writing that they have no link with the suppliers; if there is a link, they withdraw.
  • No gift, meal or benefit is accepted from a supplier, even after the award.
  • Offers are received in sealed envelopes or in a secure electronic mailbox and opened in a session, in front of at least two people.
  • Unsuccessful suppliers may ask for the reasons; a complaints mechanism is provided.
  • Suppliers are screened against sanctions lists (United Nations, donors) and internal exclusion lists.

A good supplier roster (a qualified database, with performance evaluations after each contract) speeds up procurement and reduces risk. Local procurement, when the quality is there, also supports the local economy and localisation.

Exercise: a purchase of construction materials

Situation. The shelter programme requests roofing sheets, timber and nails for 500 shelters, estimated at 95,000 USD, as a single need. The logistician proposes issuing 10 purchase orders of 9,500 USD to move quickly with simple quotations. Three offers received after a national tender (announced criteria: technical 50%, price 50%, technical minimum 35/50): X: technical 45, price 92,000; Y: technical 38, price 84,000; Z: technical 30, price 78,000.

Tasks. 1) Is the logistician's proposal acceptable? 2) Calculate the scores and designate the supplier. 3) Which documents must be in the file?

Answer. 1) No: it is splitting a single need of 95,000 USD, which falls under a tender; the expenditure would become ineligible. If the urgency is real, management can trigger a documented emergency procedure. 2) Z is eliminated (30 < 35). Lowest price between X and Y: 84,000. X: 45 + 84,000 / 92,000 × 50 = 45 + 45.65 = 90.65. Y: 38 + 50 = 88. X is selected. 3) Purchase request, budget check, tender dossier and proof of publication, bid opening record, the three offers, conflict of interest declarations, signed evaluation report, sanctions check, contract, goods receipt, invoice and payment.

Key points

  • Best value for money does not mean lowest price.
  • The threshold applies to the total need: splitting is prohibited.
  • Every exception (single source, emergency) is justified in writing and approved at the right level.
  • Criteria and weights are set and announced before offers are received.
  • A complete procurement file protects the organisation, even when the purchase is honest.

💼 Logistics and procurement jobs

Put this course into practice: the latest jobs in this field.

See all 170 Logistics and procurement jobs →

Prepare for the written test and interviewA model written test in this field, interview questions with sample answers and the STAR method.See the model test →
Further reading: course references
  1. Global Logistics Cluster (2024). Logistics Operational Guide (LOG). dlca.logcluster.org
  2. Global Logistics Cluster (2024). Logistics Capacity Assessments (LCA). lca.logcluster.org
  3. Sphere (2018). The Sphere Handbook: Humanitarian Charter and Minimum Standards in Humanitarian Response. spherestandards.org
  4. International Chamber of Commerce (ICC) (2020). Incoterms® 2020. iccwbo.org/business-solutions/incoterms-rules
  5. P. Tatham and M. Christopher (Kogan Page) (2018). Humanitarian Logistics: Meeting the Challenge of Preparing for and Responding to Disasters. www.koganpage.com
  6. World Health Organization (2020). Good Distribution Practices for Pharmaceutical Products (Annex 7, Technical Report Series 1025). www.who.int
  7. World Health Organization and partners (2017). Interagency Emergency Health Kit (IEHK). www.who.int
  8. World Health Organization (2024). Performance, Quality and Safety (PQS) – catalogue of cold chain equipment. apps.who.int/immunization_standards/vaccine_quality/pqs_catalogue
  9. World Customs Organization (2006). International Convention on the Simplification and Harmonization of Customs Procedures (Revised Kyoto Convention), Specific Annex J5. www.wcoomd.org
  10. International Federation of Red Cross and Red Crescent Societies (2007). Guidelines for the Domestic Facilitation and Regulation of International Disaster Relief and Initial Recovery Assistance (IDRL Guidelines). disasterlaw.ifrc.org
  11. Inter-Agency Standing Committee (IASC) (2013). IASC Non-Binding Guidelines on the Use of Armed Escorts for Humanitarian Convoys. interagencystandingcommittee.org
  12. United Nations Security Council (2022). Resolution 2664 (humanitarian exemption to sanctions regimes). www.un.org/securitycouncil
  13. ICRC and International Federation (2021). Climate and Environment Charter for Humanitarian Organizations. www.climate-charter.org
  14. ICRC and Brussels Privacy Hub (2020). Handbook on Data Protection in Humanitarian Action (2nd edition). www.icrc.org

Weekly quiz

5 demanding questions to check your learning. Answer them all to complete the week.

1Financial score = lowest price / price × 40. Lowest price 60,000; offer at 75,000. Score:
2A need of 48,000 USD is placed as 6 orders of 8,000 USD with simple quotations. This is:
3A specification states "brand X only" without justification. The problem is:
4After the offers are opened, the committee wants to change the price weighting from 40% to 60%. This is:
5A committee member is the cousin of a bidder. They must:

← Week 2Week 4 →